We first developed the Clipclad wall panel system for Grant Westfield in the early 2000s and it has now become an industry standard for fit-outs, particularly where access to services is important. Over the decade we have continued to evolve the concept, looking increasingly at how the system can address the needs of off-site construction.
Our core building blocks are modular ladder frames that can be delivered to site flat-pack and carried in through doorways. These frames can be factory-configured for services and reinforced where necessary to carry sanitary ware. Finally these frames can be clad with precise panels, machined from materials that would be hard to craft on site. In summary, a much more flexible approach to off-site construction than the volumetric alternatives.
A low-cost, multi-purpose stacking chair designed for robotic manufacture.
View case study
A compact and easy to use mobile body scanner for the Paris-based pioneers of ultrasound techniques.
View case study
Developable surface geometry used to create curvaceous products for the streetscape.
View case study
A revolutionary medical device that cleans the lens of the laparascope with a high-speed gas jet and increases theatre productivity.
View case study